Almost got caught out with this being listed under
Playa Blanca instead of Camen!
Yes, it's for the storm drains. Since when the work
was done, no one thought about where the water
would go when it got to the beach!
Anyway the work was still ongoing this morning
with some new sections of pipe made up on the
beach to be draged out and sunk at
some point. The barge with digger on has been
busy digging a trench in the sea to drop the
pipes in, hopefully in the next week or two
it may be finished, although I suspect it
will take a few high winter tides to wash the
beach back into a nice undisturbed state!
As far as I know all the work at the San Antonio
hotel end is completed.
Keith